Constarium
← Search

Data · dataset · 2025

ROSETTA-ORBITER CHECK GIADA 2 CVP1 COMMISSIONING1 V1.0

Listed in NASA Data Portal

This volume contains Experiment Data acquired by GIADA during 'Commissioning 1' phase.

Description

More in detail it refers to the data provided during the following in-flight tests: 'First GIADA switch ON' held on 03/04-04-2004. It also contains documentation which describes the GIADA experiment.

The data reported in this data set have been converted from ADC counts to engineering values. The quality of the Housekeeping and Calibration data is good. Scientific data are due to noise, as no grain event is expected during this mission phase.

Read the rest (2 more)

These data must be only considered to evaluate GIADA behaviour and not as real scientific data. Data reported by GDS and IS are due to noise as no dust event is expected during this mission phase. MBS frequency changes, once normalised for frequency vs. temperature dependence, if present, are due to deposition of contaminants existing in the S/C environment.

Housekeeping and Calibration data from all GIADA sub-systems are useful to evaluate instrument health and behaviour when compared with similar data acquired during other mission phases.

Links

Related

Provenance · 1 source records, 6 field assertions
SourceKeyLast seenRaw
NASA Data Portalfcf170d7-ab35-4dfb-9e1b-91c0fac0843412 d agoJSON v1
FieldAssertionExtractorEvidence
created_datesource · data nasa govconnector:data_nasa_gov@1.0.0
descriptionsource · data nasa govconnector:data_nasa_gov@1.0.0/notes
license_textsource · data nasa govconnector:data_nasa_gov@1.0.0
publication_datesource · data nasa govconnector:data_nasa_gov@1.0.0
titlesource · data nasa govconnector:data_nasa_gov@1.0.0/title
updated_datesource · data nasa govconnector:data_nasa_gov@1.0.0