← Search

Archive · dataset · 2022

Simplified electricity transmission system from UK (2020) – ATTEST project

Listed in INESC TEC Research Data Repository

This dataset was prepared under the framework of the ATTEST project, financed by the European Commission with grant number 864298.

Description

The dataset contains information about a simplification of the real UK transmission grid as in 2020. The grid topology contains 30 nodes, 100 branches and 98 generators.

It is operated at 400 kV and 275 kV. A network model (MatPower format) including the grid information (including grid topology, nodes, generators, consumption, all of which connected by power lines or transformers) is provided.

Links

Topics

Inferred from text
Electrical engineering 70%
Provenance · 1 source records, 11 field assertions
SourceKeyLast seenRaw
INESC TEC Research Data Repositorybb60daed-51e2-4471-b8bd-f12aa516905813 d agoJSON v1
FieldAssertionExtractorEvidence
access_levelsource · rdm inesctec ptconnector:rdm_inesctec_pt@1.0.0
concepts[field].anzsrc:group:4008enrichment · rdm inesctec pttaxonomy-embedding@1.1.0title+keywords+description (70%)
concepts[field].local:field:computer-science-aimapping · rdm inesctec ptconnector:rdm_inesctec_pt@1.0.0
concepts[field].local:field:energymapping · rdm inesctec ptconnector:rdm_inesctec_pt@1.0.0
concepts[field].local:field:engineeringmapping · rdm inesctec ptconnector:rdm_inesctec_pt@1.0.0
created_datesource · rdm inesctec ptconnector:rdm_inesctec_pt@1.0.0
descriptionsource · rdm inesctec ptconnector:rdm_inesctec_pt@1.0.0/notes
license_textsource · rdm inesctec ptconnector:rdm_inesctec_pt@1.0.0
publication_datesource · rdm inesctec ptconnector:rdm_inesctec_pt@1.0.0
titlesource · rdm inesctec ptconnector:rdm_inesctec_pt@1.0.0/title
updated_datesource · rdm inesctec ptconnector:rdm_inesctec_pt@1.0.0