Constarium
← Search

Data · dataset · 2026

HIGH Horizons - Integrated Adaptation and Mitigation Intervention Costing Tool

Listed in LSHTM Data Compass

The Integrated Adaptation and Mitigation Intervention (IAMI) costing tool is a spreadsheet-based micro-costing tool used to estimate the costs of facility-level adaptation and mitigation interventions, including supplies, equipment, personnel, and programme activities.

Description

The tool is structured as an Excel workbook with separate tabs for each type of cost. This record contains the spreadsheet and the guide that works you through the different steps.

Links

Where it is published

Catalogue records · 1

Topics

Provenance · 1 source records, 8 field assertions
SourceKeyLast seenRaw
LSHTM Data Compassoai:datacompass.lshtm.ac.uk:52758 d agoJSON v1
FieldAssertionExtractorEvidence
concepts[field].local:field:earth-environmentalmapping · lshtm ac ukconnector:lshtm_ac_uk@1.0.0
concepts[field].local:field:humanitiesmapping · lshtm ac ukconnector:lshtm_ac_uk@1.0.0
concepts[field].local:field:life-sciencesmapping · lshtm ac ukconnector:lshtm_ac_uk@1.0.0
concepts[field].local:field:medicine-healthmapping · lshtm ac ukconnector:lshtm_ac_uk@1.0.0
concepts[field].local:field:social-sciencemapping · lshtm ac ukconnector:lshtm_ac_uk@1.0.0
descriptionsource · lshtm ac ukconnector:lshtm_ac_uk@1.0.0/metadata/dc/description
publication_datesource · lshtm ac ukconnector:lshtm_ac_uk@1.0.0
titlesource · lshtm ac ukconnector:lshtm_ac_uk@1.0.0/metadata/dc/title